87-unit residential tower, Downtown Calgary — Full Mechanical Prime
Analog Mechanical held the prime mechanical contract for The HAT @ Eau Claire Place, delivering the complete mechanical scope for all 87 residential suites in a converted office tower in the Eau Claire neighbourhood of Downtown Calgary.
Every mechanical system in the building — from the domestic water plant in the mechanical room to the rough-in in each individual suite — was self-performed by our in-house Alberta-certified journeypersons under a single prime mechanical contract with Cidex Development.
Residential high-rise construction in Downtown Calgary presents a specific set of mechanical coordination challenges that don't exist on suburban or mid-rise projects. The HAT was no different.
Mechanical rough-in must be complete and inspected floor-by-floor before each structural concrete pour. No rework after the slab is poured. Every penetration, sleeve, and stub-up had to be right the first time.
Limited staging area in the Eau Claire / Downtown core meant materials had to be delivered and moved to the floor of installation with no laydown yard. Just-in-time delivery and vertical logistics were critical.
Cidex Development had firm occupancy dates. Mechanical had to stay ahead of the drywall and finishing trades on every floor — no floor left behind, no schedule float consumed by mechanical delays.
87 individual suite rough-ins, each requiring plumbing, gas, and hydronic connections to common risers — all coordinated within the structural grid and suite framing layouts.
The HAT was delivered using the same approach we apply to all high-rise residential projects: pre-fabricate where possible, coordinate daily, and stay ahead of the concrete schedule.
The HAT @ Eau Claire Place was completed on schedule, meeting Cidex Development's occupancy dates. The mechanical scope was delivered without deficiencies at the occupancy inspection — a result that comes from doing the work right the first time, not from chasing punchlist items at the end.
ABSA sign-off was obtained on all pressure systems, and full as-built documentation was provided to the developer at closeout.
Delivered within the project schedule — mechanical never held up the GC, drywall, or finishing trades on any floor.
No outstanding deficiencies at the occupancy inspection — all 87 suites and all common mechanical systems passed first time.
All pressure systems — boiler plant, domestic water, and hydronic distribution — received ABSA sign-off with complete documentation provided at closeout.
Full as-built drawings, O&M manuals, warranty documentation, and inspection certificates delivered to Cidex Development at project closeout.