HAT @ Eau Claire Office Conversion | Analog Mechanical
The HAT at Eau Claire Place — residential tower exterior, Downtown Calgary
Project Case Study

The HAT @ Eau Claire Place

87-unit residential tower, Downtown Calgary — Full Mechanical Prime

Residential Downtown Calgary 87 Units Office Conversion Full Mechanical Scope
87
Residential Units
Downtown
Calgary
Location — Eau Claire
Full
Mechanical
Scope — Prime Contract
Cidex
Development
Developer
01 — The Scope

What Analog Delivered

Analog Mechanical held the prime mechanical contract for The HAT @ Eau Claire Place, delivering the complete mechanical scope for all 87 residential suites in a converted office tower in the Eau Claire neighbourhood of Downtown Calgary.

Every mechanical system in the building — from the domestic water plant in the mechanical room to the rough-in in each individual suite — was self-performed by our in-house Alberta-certified journeypersons under a single prime mechanical contract with Cidex Development.

Full Plumbing Rough-In Domestic Hot & Cold Water Systems DWV — Drain, Waste & Vent Gas Distribution Hydronic Heating System Suite Rough-Ins — All 87 Units Mechanical Room Equipment ABSA Pressure System Compliance Commissioning & Closeout
02 — The Challenge

High-Rise in the Dense Downtown Core

Residential high-rise construction in Downtown Calgary presents a specific set of mechanical coordination challenges that don't exist on suburban or mid-rise projects. The HAT was no different.

Concrete Pour Coordination

Mechanical rough-in must be complete and inspected floor-by-floor before each structural concrete pour. No rework after the slab is poured. Every penetration, sleeve, and stub-up had to be right the first time.

Dense Downtown Staging

Limited staging area in the Eau Claire / Downtown core meant materials had to be delivered and moved to the floor of installation with no laydown yard. Just-in-time delivery and vertical logistics were critical.

Schedule to Occupancy

Cidex Development had firm occupancy dates. Mechanical had to stay ahead of the drywall and finishing trades on every floor — no floor left behind, no schedule float consumed by mechanical delays.

87-Unit Coordination

87 individual suite rough-ins, each requiring plumbing, gas, and hydronic connections to common risers — all coordinated within the structural grid and suite framing layouts.

03 — Our Approach

How We Executed

The HAT was delivered using the same approach we apply to all high-rise residential projects: pre-fabricate where possible, coordinate daily, and stay ahead of the concrete schedule.

  • Pre-fabrication of common assemblies off-site — riser manifolds, common mechanical room assemblies, and repetitive suite rough-in sub-assemblies were prefabricated in our shop and delivered to site floor-ready, reducing on-site labour time and minimizing staging requirements.
  • Daily coordination with GC and other trades — regular on-site coordination with the general contractor and other subtrades kept mechanical sequencing aligned with structural, electrical, and framing schedules on every floor.
  • Phased floor-by-floor delivery — each floor was treated as its own scope package — rough-in complete, inspected, and cleared for concrete before the crew moved to the next floor. No floors left partially complete while waiting on materials or manpower.
  • COR-certified safety protocols — standard Analog safety management throughout: daily hazard assessments, required PPE, and all ABSA pressure system documentation maintained current from day one.
04 — Results

Delivered on Schedule. Zero Deficiencies.

The HAT @ Eau Claire Place was completed on schedule, meeting Cidex Development's occupancy dates. The mechanical scope was delivered without deficiencies at the occupancy inspection — a result that comes from doing the work right the first time, not from chasing punchlist items at the end.

ABSA sign-off was obtained on all pressure systems, and full as-built documentation was provided to the developer at closeout.

On Schedule

Delivered within the project schedule — mechanical never held up the GC, drywall, or finishing trades on any floor.

Zero Deficiencies at Occupancy Inspection

No outstanding deficiencies at the occupancy inspection — all 87 suites and all common mechanical systems passed first time.

Full ABSA Sign-Off

All pressure systems — boiler plant, domestic water, and hydronic distribution — received ABSA sign-off with complete documentation provided at closeout.

Complete Closeout Package

Full as-built drawings, O&M manuals, warranty documentation, and inspection certificates delivered to Cidex Development at project closeout.