108-unit office-to-residential adaptive reuse conversion, Downtown Calgary - Full Mechanical Prime
Analog Mechanical held the prime mechanical contract for The HAT @ 9th, delivering the complete mechanical scope for all 108 residential suites within a repurposed commercial office tower in Calgary's 9th Avenue corridor.
Office-to-residential conversion is mechanically unlike any other project type. Commercial buildings are not built for residential plumbing loads, suite-by-suite gas distribution, or the domestic water and DWV demands of 108 individual homes. Our team designed and installed an entirely new residential mechanical infrastructure within an existing structure, threading new systems through existing floor assemblies, around existing structural elements, and across a building that was never intended to be a residential tower.
Office-to-residential conversions are among the most mechanically complex project types in Calgary's construction market. The existing building infrastructure, designed for commercial tenants, open floor plates, and centralized HVAC, has to be fundamentally re-engineered to support 108 individual residential suites, each with its own plumbing, gas, and heating requirements.
Every penetration through an existing slab requires engineering review, precise core drilling, and waterproofing detail. There is no tolerance for error, the structural integrity of an occupied building can't be compromised, and rework after the slab is penetrated is costly and difficult.
Commercial towers have no residential riser shafts, no domestic water distribution designed for suite-level demand, and no DWV system capable of handling 108 residential units. All of this had to be designed and installed from scratch within an existing building envelope.
Conversion work requires methodical floor-by-floor sequencing coordinated with demolition, framing, and electrical trades, in a building with existing vertical circulation and limited staging access. Material movement and trade coordination required precision scheduling throughout.
Meeting residential plumbing and gas code requirements within a structure originally designed to commercial standards meant solving non-standard details throughout, particularly around DWV venting, fixture unit loads, and gas pressure distribution across 108 suites.
Adaptive reuse projects demand a different execution model than new construction. You can't rely on the building being designed for what you're installing. Our approach on The HAT @ 9th was built around early coordination, detailed pre-planning of every riser and penetration location, and a phased floor-by-floor delivery that matched the demolition and framing schedule.
The mechanical scope for The HAT @ 9th was delivered on schedule, with all 108 suites mechanically complete and inspected ahead of occupancy. The project added 108 residential units to Calgary's downtown core, part of the city's broader effort to convert underutilized office space into housing.
Full ABSA sign-off was obtained on all pressure systems and complete as-built documentation was provided at project closeout.
Mechanical scope delivered within the conversion project schedule, every floor completed and cleared before framing and drywall closed in behind us.
All 108 suites and all new common mechanical systems passed the occupancy inspection without outstanding deficiencies.
All pressure systems, including the new domestic water plant and hydronic distribution, received ABSA sign-off with complete documentation at closeout.
The project contributed 108 residential units to Calgary's downtown conversion program, one of 21 approved conversions adding 2,600+ units to the city centre.